Rossyb

Forum Replies Created

Viewing 5 posts - 1 through 5 (of 5 total)
  • Author
    Posts
  • in reply to: major works cap #2542
    Rossyb
    Participant

      The £3000 outstanding amount should have been discovered by your solicitor when they did their searches for your purchase.
      In a recent case I heard about the purchaser pursued the solicitor for the amount as it was their error. In the case in question the amount was £17K and the solicitor had to cough the lot.

      I agree about the major works. They seem to come out of nowhere with no thought for the ability of the leaseholder’s ability to pay. I am also an artist (must be something in the NW6 air) and had no way of paying the £17K they were threatening for the EWI works.

      We did fight it though and won with Camden cancelling the works which totally unneeded.

      We all need to remember that Camden makes a per-centage commission on all works and are incentivised to spend as much as possible. Its a bloody scandal made even worse by the preferred contrator/partner system where there is no need to even have competitive bids. The sooner we all organise to take over the management of our properties the better.

      Rossyb
      Participant

        I have had a surveyor go through the details of the proposed works and he has a number of concerns which I will be running through and forwarding to Camden for their answers.
        He has also directed me to the license for the product that will be used for this process and you can click here to see it-
        BBA EWI certificate

        Have a look through and see what other points you can find to quiz Camden on. Please also check to see if Lakehouse are even licensed to use this product. I haven’t seen them listed.

        An example of items of concern is point 14.
        A copy of the email that I have sent to John Rutter (liason officer) is shown below.
        The fight goes on and we are getting closer to winning

        Dear Mr Rutter
        I am pleased to hear that the process is still open. This is a very complicated and expensive issue.
        After much research and the help of a surveyor I have found the certificate for the materials that will be used (the link is below) and draw your attention to points 14 in particular. (shown below)

        It is clear that a lot of preparation and surveying must be done before this process is even considered. Please confirm that all these stages and have been followed and provide me with the relevant report that this process produced.

        14 Site survey and preliminary work
        14.1 A pre-installation survey of the property must be carried out to determine whether repairs are required to the sheathing board or steel frame and repairs should be carried out before application of the Epsitec External Wall Insulation System. A specification is prepared for each elevation of the building indicating, for example: • position of starter tracks, cavity spacer tracks and render beads • additional reinforcing scrim at corners of openings • detailing around windows, doors and at eaves • damp-proof course (dpc) level • location and type of weather seals to be used and location of water-deflection channels • areas where suitable silicone sealants must be used • position of fire barriers and cavity fire stops.
        14.2 The survey should include tests conducted on the steel frame of the building by the Certificate holder or their approved applicators (see section 15) to determine the pull-out resistance of the proposed mechanical fixings. An assessment and recommendation is made on the type and number of fixings required to withstand the building’s expected wind loading based on calculations using the relevant wind speed data for the site and the pull-out resistances (see section 7).
        14.3 Surfaces should be sound, clean, and free from loose material. The flatness of surfaces must be checked; this may be achieved by using a straight-edge spanning the storey height. Excessive irregularities, ie greater than 10 mm, must be made good prior to installation to ensure that the steel frames are installed with a smooth, in-plane finished surface.
        14.4 On existing buildings, purpose-made window sills must be fitted to extend beyond the finished face of the system (see section 16.7). New buildings should incorporate suitably deep sills.
        14.5 Internal wet work, eg screeding or plastering, should be completed and allowed to dry prior to the application of a system.
        14.6 All modifications, such as provision for fire stopping (see section 8) and necessary repairs to the building must be completed before installation commences

        Click to access 4625PS1i2.pdf

        It is my contention that these guidelines have not been followed and that there are various reasons highlighted here to show that the buildings are not suitable for this process.

        I look forward to your reply.

        Rossyb
        Participant

          We are all upset about this and doing our best to stop it happening.
          But time is (deliberately) very short and we all need to get as many people as possible to post their objections on the planning link above and contact anyone you can think of- MP, councillors, newspapers, TV, radio, personalities, neighbours.
          Anyone you can think of and don’t worry if any of this is duplicated effort as the more we try the better. Sometimes it takes a lot of chops to bring down a big tree.
          Keep swinging!

          Rossyb
          Participant

            Hi Ann
            I feel and share your pain on the way we have been treated. It must be particularly stressful for your father.

            In theory you should be able to voice your concerns via the consultation process and submit your comments via the consultation officer that you have been allocated. In practise, these people seem determined to push these projects through regardless of objections and costs. In our case the head of the project, the assistant and the consultation officer have all gone on holidays and won’t even be back until after the deadline! So not very convincing.

            The planning department are the best chance for submitting comments and objections. These need to be as technical and specific to the works and impacts as possible. No-one seems bothered about affordability for some reason. Even though leaseholders are going to face bills they cant pay (mine is £17,400!) and the tenants’ share of the tab is going to be picked up via the public through council tax and charges. And this is supposed to be a time of austerity and removal of “heating poverty” is supposed to be a main incentive for this EWI work.

            The letter should have a planning number on it will. If you follow the link below you should then be able to enter the code and find somewhere to enter your comments and objections for the planning department to see.

            planning link – click here

            Please also add the reference here so that other people can access it and add their comments.
            The planning process should also give the opportunity for other people that may be effected by the works to make their comments. E.g. Someone living opposite might object to the appearance and claim that it is blocking their view. This has not been done in this case and it is very difficult to find out what is going on – even if you are aware of it. A lot of people in the vicinity are going to have a real shock too late for them to do anything about it.

            I just searched for something on the project on your father’s estate and can’t find it even when I am looking for it.

            The link to the Hillgrove estates is in my post above and be accessed and commented on whether you live in that estate OR NOT.

            There are lots of comments and objections there that you should read and copy the bits that are useful for blocking the works at yours as well. For example, damp issues, appearance issues, loss of light, attraction of graffiti all apply in your case as well. If you could post your number I could have a look to see if there is anything that can be used in our case.

            We have to work together and share information.

            Please also feel free to email me at rossyb AT yahoo.com

            Rossyb
            Participant

              Managed to get the closing date for submissions to the planning department pushed back to September 7th.
              They have also reopened the webpage as it has been crashed for the last few days – a clear violation of the consultation process as it was supposed to be open until August 25th.
              Unfortunately they are not telling anyone that they have done this! So it is down to us to spread the word and get as many people commenting as possible.
              Follow this link to make your comments heard and seen-
              It is not too late to add objections. They do read these and this is a crucial stage in stopping this.

              Click here for Camden planning link

            Viewing 5 posts - 1 through 5 (of 5 total)